How do you make
1,200
BIM engineers
produce consistent work?

Parveen Sharma has spent 26 years building BIM teams. Today he runs 1,200 engineers delivering around the clock from India to North America, Europe and Asia Pacific, on projects from the world's largest airport to Tesla's gigafactory. We asked him what actually holds that together.

Thursday 29 October · 11:00 CET · 30 minutes · Online

Write your awesome label here.

Engineers

Projects

Continents
Write your awesome label here.

What you will get

Four things you can use on Monday, not four reasons to admire someone else’s company.
What stops working at 5, at 50 and at 500 people, and what you have to put in place before
you get there
How a model is handed between three time zones every day without losing a day to it.
How someone new goes from their first week to touching a model on a billion dollar project.
What Parveen would do differently if he were starting the company today.

Who this is for

If you manage people who work on models, this one is for you.

BIM managers

growing a team past the point where you can check everything yourself.

Design and engineering leads

working with distributed, outsourced or offshore teams.

Anyone...

who has inherited a model from another office and spent two days working out whatwas in it

Who's talking

One person who has done it at 1,200. Two who work on the standards underneath it.
Parveen Sharma
Founder, The BIM Engineers
Founded The BIM Engineers in 2018 and now runs 1,200 engineers delivering BIM around the
clock across four continents. 26 years in the industry, on some of the largest projects in the
world.
Magdalena Pyszkowski
Co-founder & CTO, Tylko Advisors
Product data standards, openBIM, and the DPP rules being written now. She is behind Data Framer and our DPP Readiness Program, and presented the DPP for openBIM work at the buildingSMART International Summit in Tokyo this month.
Sotiria Asaridou
Associate BIM Consultant, Tylko Advisors
BIM implementation, and what a Digital Product Passport has to carry. She works with manufacturers on turning the documents they already have into structured product data, and co-presented the Hello Wall pilot results in Tokyo.

A BIM team does not break when it grows.
It breaks at specific sizes.

What changes at five people, at fifty, and at five hundred.

At five people, quality control is a conversation. You look over someone's shoulder, you catch it, you move on. At fifty, that stops scaling and you replace it with standards, templates and a naming convention somebody has to own. At five hundred, across several time zones, even that is not enough, because the person who wrote the standard is asleep while the model is being worked on.
Most advice about scaling BIM teams comes from people who have grown a team to thirty.
Parveen has done it to 1,200, in a delivery model where work moves between Delhi, Europe and
North America every eight hours, on projects where a mistake is measured in millions.
This session is not about his company. It is about what he had to put in place, in what order,
and what he got wrong on the way.

Save Your Seat

Fifteen seconds to register. The recording reaches you either way.

Frequently asked questions

The things people want to know before they sign up.

Is it really free?

Yes. No card, no trial, nothing to cancel.

What time is it where I am?

11:00 CET. That is 10:00 in London, 15:30 in India, 06:00 on the US East Coast.

Will I get the recording?

Everyone who registers gets it, whether you attend or not.

Do I need BIM experience?

No. If you manage people who work on models, you will follow it.

Can I share this with my team?

Please do. Everyone needs to register separately so we can
send them the recording.